BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

能源与环境 · 2026/3/241 分钟阅读

Duke Energy Progress, LLC; H.B. Robinson Steam Electric Plant, Unit No. 2; Exemption

本地自动翻译 · 来源原始语言

摘要

The U.S. Nuclear Regulatory Commission (NRC) has issued an exemption, on its own initiative, from the regulation that would have required Duke Energy Progress, LLC (Duke) to submit an amendment to the application for subsequent renewal of Renewed Facility Operating License No. DPR-23 for H.B. Robinson Steam Electric Plant, Unit No. 2 (Robinson), each year following its submittal and at least 3 months before scheduled completion of the NRC review, that identifies any change to the current licensing basis of the facility that materially affects the content of the application during the NRC's review of that application. Due to this exemption, such amendments are no longer required for the Robinson subsequent license renewal application.

来源原始语言: Federal Register — Nuclear Regulatory Commission打开原始公告 →

探索专题

商业洞察 →