BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Énergie et environnement · 24/03/20261 min de lecture

Duke Energy Progress, LLC; H.B. Robinson Steam Electric Plant, Unit No. 2; Exemption

Traduction automatique locale · Langue originale de la source

Résumé

The U.S. Nuclear Regulatory Commission (NRC) has issued an exemption, on its own initiative, from the regulation that would have required Duke Energy Progress, LLC (Duke) to submit an amendment to the application for subsequent renewal of Renewed Facility Operating License No. DPR-23 for H.B. Robinson Steam Electric Plant, Unit No. 2 (Robinson), each year following its submittal and at least 3 months before scheduled completion of the NRC review, that identifies any change to the current licensing basis of the facility that materially affects the content of the application during the NRC's review of that application. Due to this exemption, such amendments are no longer required for the Robinson subsequent license renewal application.

Langue originale de la source: Federal Register — Nuclear Regulatory CommissionOuvrir le communiqué original →

Explorer les analyses

Analyses business →