BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

能源与环境 · 2025/10/21 分钟阅读

NUREG: Guidelines for Inservice Testing at Nuclear Power Plants-Inservice Testing of Pumps and Valves and Inservice Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power Plants

本地自动翻译 · 来源原始语言

摘要

The U.S. Nuclear Regulatory Commission (NRC) is issuing NUREG- 1482, Revision 4, "Guidelines for Inservice Testing at Nuclear Power Plants--Inservice Testing of Pumps and Valves and Inservice Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power Plants." NUREG-1482, Revision 4 provides a basic understanding of the regulatory basis for pump and valve inservice testing (IST) programs and dynamic restraint (snubbers) examination and testing programs. This NUREG also provides information regarding the NRC's involvement in the development of the American Society of Mechanical Engineers (ASME) Operation and Maintenance of Nuclear Power Plants, Division 1, OM Code: Section IST (OM Code).

来源原始语言: Federal Register — Nuclear Regulatory Commission打开原始公告 →

探索专题

商业洞察 →