BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 2022/11/212 分钟阅读

Air Plan Approval; North Carolina; Charlotte-Gastonia-Rock Hill Area Limited Maintenance Plan for the 1997 8-Hour Ozone NAAQS

本地自动翻译 · 来源原始语言

摘要

The Environmental Protection Agency (EPA) is proposing to approve a state implementation plan (SIP) revision submitted by the State of North Carolina, through the North Carolina Division of Air Quality (NCDAQ), via a letter dated December 9, 2021. The SIP revision includes the 1997 8-hour ozone national ambient air quality standards (NAAQS) Limited Maintenance Plan (LMP) for the North Carolina portion (hereinafter referred to as the Metrolina Area) of the Charlotte-Gastonia-Rock Hill NC-SC 1997 8-hour ozone maintenance area (hereinafter referred to as the "Charlotte NC-SC 1997 8-hour NAAQS Area"). The Charlotte NC-SC 1997 8-hour NAAQS Area is comprised of Cabarrus, Gaston, Lincoln, Mecklenburg, Rowan, and Union Counties and a portion of Iredell County (i.e., Coddle Creek and Davidson Townships) in North Carolina; and the Rock Hill Metropolitan Planning Organization boundary in York County, South Carolina. EPA is proposing to approve the Metrolina Area LMP because it provides for the maintenance of the 1997 8-hour ozone NAAQS within the Metrolina Area through the end of the second 10-year portion of the maintenance period in 2034. The effect of this action would be to make certain c

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →