本文翻译正在准备中。在此之前,我们暂时显示英文原文。
能源与环境 · 2019/5/91 分钟阅读
Atomic Safety and Licensing Board; in the Matter of Powertech USA, Inc.; Dewey-Burdock in Situ Uranium Recovery Facility
本地自动翻译 · 来源原始语言
摘要
The U.S. Nuclear Regulatory Commission (NRC) is issuing an Order to set a schedule for an evidentiary hearing in the Powertech USA, Inc., Dewey-Burdock In Situ Uranium Recovery Facility proceeding. The Order for Granting NRC Staff Motion and Scheduling Evidentiary Hearing became effective on April 29, 2019.
来源原始语言: Federal Register — Nuclear Regulatory Commission打开原始公告 →