Energía y medio ambiente · 9/5/20191 min de lectura
Atomic Safety and Licensing Board; in the Matter of Powertech USA, Inc.; Dewey-Burdock in Situ Uranium Recovery Facility
Traducción automática local · Idioma original de la fuente
Resumen
The U.S. Nuclear Regulatory Commission (NRC) is issuing an Order to set a schedule for an evidentiary hearing in the Powertech USA, Inc., Dewey-Burdock In Situ Uranium Recovery Facility proceeding. The Order for Granting NRC Staff Motion and Scheduling Evidentiary Hearing became effective on April 29, 2019.