BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

商业 · 2019/8/301 分钟阅读

Central Electric Power Cooperative, Inc.: Notice of Intent and Availability of a Supplemental Draft Environmental Impact Statement and Notice to Hold a Public Meeting

本地自动翻译 · 来源原始语言

摘要

The Rural Utilities Service (RUS), an agency within the U.S. Department of Agriculture (USDA), has issued a Supplemental Draft Environmental Impact Statement (Supplemental Draft EIS) for Central Electric Power Cooperative's (Central Electric) proposed McClellanville Area 115-kV Transmission Project (Project) in South Carolina. In this document, RUS analyzes the environmental impacts associated with an anticipated decision request to approve or deny funding for Central Electric's proposed Project. The Supplement Draft EIS was prepared to address substantial changes to the proposed action and assesses new circumstances and information relevant to potential environmental impacts originally evaluated in the Draft Environmental Impact Statement (Draft EIS). In April 2014, RUS issued a Draft EIS that evaluated six 115-kV transmission line corridors originating in Georgetown County, South Carolina and terminating in the McClellanville area of Charleston County, South Carolina. Since publication of the Draft EIS, updated engineering data has resulted in substantial changes to the proposed action, including the need to evaluate new transmission line corridors originating from the Jamestown

来源原始语言: Federal Register — Agriculture Department打开原始公告 →

探索专题

商业洞察 →