BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Negocios · 30/8/20191 min de lectura

Central Electric Power Cooperative, Inc.: Notice of Intent and Availability of a Supplemental Draft Environmental Impact Statement and Notice to Hold a Public Meeting

Traducción automática local · Idioma original de la fuente

Resumen

The Rural Utilities Service (RUS), an agency within the U.S. Department of Agriculture (USDA), has issued a Supplemental Draft Environmental Impact Statement (Supplemental Draft EIS) for Central Electric Power Cooperative's (Central Electric) proposed McClellanville Area 115-kV Transmission Project (Project) in South Carolina. In this document, RUS analyzes the environmental impacts associated with an anticipated decision request to approve or deny funding for Central Electric's proposed Project. The Supplement Draft EIS was prepared to address substantial changes to the proposed action and assesses new circumstances and information relevant to potential environmental impacts originally evaluated in the Draft Environmental Impact Statement (Draft EIS). In April 2014, RUS issued a Draft EIS that evaluated six 115-kV transmission line corridors originating in Georgetown County, South Carolina and terminating in the McClellanville area of Charleston County, South Carolina. Since publication of the Draft EIS, updated engineering data has resulted in substantial changes to the proposed action, including the need to evaluate new transmission line corridors originating from the Jamestown

Idioma original de la fuente: Federal Register — Agriculture DepartmentAbrir el comunicado original →