BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

能源与环境 · 2017/5/31 分钟阅读

Department of the Air Force; Robins Air Force Base, Georgia; Proposed Decommissioning Plan

本地自动翻译 · 来源原始语言

摘要

The U.S. Nuclear Regulatory Commission (NRC) has received a license amendment application from the Department of the Air Force (the licensee) for approval of a proposed decommissioning plan (DP). Materials License 42-23539-01AF authorizes the licensee to issue permits to individual Air Force bases for use of byproduct, source, and special nuclear material as authorized by the licensee's Radioisotope Committee. The licensee is requesting approval of a DP for cleanup of residual depleted uranium inside and underneath Building 181 at Robins Air Force Base, Georgia. The NRC is currently conducting a detailed technical review of the DP. If the DP is approved by the NRC, the licensee would be authorized to remediate the building interior and subsurface area in accordance with instructions provided in the DP.

来源原始语言: Federal Register — Nuclear Regulatory Commission打开原始公告 →

探索专题

商业洞察 →