BN Business News
Aggiungi la tua azienda →
Questa traduzione è in preparazione. Nel frattempo mostriamo temporaneamente la versione originale in inglese.

Energia e ambiente · 03/05/20171 min di lettura

Department of the Air Force; Robins Air Force Base, Georgia; Proposed Decommissioning Plan

Traduzione automatica locale · Lingua originale della fonte

Riepilogo

The U.S. Nuclear Regulatory Commission (NRC) has received a license amendment application from the Department of the Air Force (the licensee) for approval of a proposed decommissioning plan (DP). Materials License 42-23539-01AF authorizes the licensee to issue permits to individual Air Force bases for use of byproduct, source, and special nuclear material as authorized by the licensee's Radioisotope Committee. The licensee is requesting approval of a DP for cleanup of residual depleted uranium inside and underneath Building 181 at Robins Air Force Base, Georgia. The NRC is currently conducting a detailed technical review of the DP. If the DP is approved by the NRC, the licensee would be authorized to remediate the building interior and subsurface area in accordance with instructions provided in the DP.

Lingua originale della fonte: Federal Register — Nuclear Regulatory CommissionApri il comunicato originale →

Esplora gli approfondimenti

Analisi aziendali →