本文翻译正在准备中。在此之前,我们暂时显示英文原文。
监管与法律 · 2015/10/91 分钟阅读
Notice of Availability of the Draft Environmental Impact Statement for the Nebraska Highway 12 Niobrara East and West Project, Knox County, NE
本地自动翻译 · 来源原始语言
摘要
The U.S. Army Corps of Engineers (Corps), Omaha District, has prepared a Draft Environmental Impact Statement (EIS) to analyze the direct, indirect and cumulative effects of a proposed Nebraska State Highway project, Nebraska Highway 12 Niobrara East and West Project by the Nebraska Department of Roads (NDOR). The Applied-for Project is the relocation and elevation (including additional bridges) of two segments of existing Nebraska Highway 12 (N-12) that are frequently flooded and have incurred damage due to high water levels associated with the Missouri River.
来源原始语言: Federal Register — All Documents打开原始公告 →