The U.S. Army Corps of Engineers (Corps), Omaha District, has prepared a Draft Environmental Impact Statement (EIS) to analyze the direct, indirect and cumulative effects of a proposed Nebraska State Highway project, Nebraska Highway 12 Niobrara East and West Project by the Nebraska Department of Roads (NDOR). The Applied-for Project is the relocation and elevation (including additional bridges) of two segments of existing Nebraska Highway 12 (N-12) that are frequently flooded and have incurred damage due to high water levels associated with the Missouri River.