监管与法律 · 2014/8/111 分钟阅读
Drawbridge Operation Regulations; Gulf Intracoastal Waterway, St. Petersburg Beach, FL
本地自动翻译 · 来源原始语言
摘要
The Coast Guard proposes to change the operating schedule that governs the Pinellas Bayway Structure "E" (SR 679) Bridge, Gulf Intracoastal Waterway mile 113.0, St. Petersburg Beach, FL. This proposal would extend the time period when the bridge is subject to periodic openings. During this extended time period the bridge will not open on demand.