Düzenleme ve hukuk · 11.08.20141 dk okuma
Drawbridge Operation Regulations; Gulf Intracoastal Waterway, St. Petersburg Beach, FL
Yerel otomatik çeviri · Kaynağın orijinal dili
Özet
The Coast Guard proposes to change the operating schedule that governs the Pinellas Bayway Structure "E" (SR 679) Bridge, Gulf Intracoastal Waterway mile 113.0, St. Petersburg Beach, FL. This proposal would extend the time period when the bridge is subject to periodic openings. During this extended time period the bridge will not open on demand.