本文翻译正在准备中。在此之前,我们暂时显示英文原文。
国际贸易 · 2004/10/201 分钟阅读
Certain Stainless Steel Butt-Weld Pipe Fittings From Taiwan: Extension of Time Limit for Final Results of Antidumping Duty Administrative Review
本地自动翻译 · 来源原始语言
摘要
The Department of Commerce ("the Department") is extending the time limit for the final results of the review of stainless steel butt-weld pipe fittings from Taiwan. This review covers the period June 1, 2002, through May 31, 2003.
来源原始语言: Federal Register — Department of Commerce打开原始公告 →