Comércio internacional · 20/10/20041 min de leitura
Certain Stainless Steel Butt-Weld Pipe Fittings From Taiwan: Extension of Time Limit for Final Results of Antidumping Duty Administrative Review
Tradução automática local · Idioma original da fonte
Resumo
The Department of Commerce ("the Department") is extending the time limit for the final results of the review of stainless steel butt-weld pipe fittings from Taiwan. This review covers the period June 1, 2002, through May 31, 2003.