本文翻译正在准备中。在此之前,我们暂时显示英文原文。
国际贸易 · 2004/11/261 分钟阅读
Stainless Steel Wire Rod From India: Extension of Time Limit for the Preliminary Results of the Antidumping Duty Administrative Review
本地自动翻译 · 来源原始语言
摘要
The Department of Commerce is extending the time limit for the preliminary results of the administrative review of the antidumping duty order on stainless steel wire rod from India until December 30, 2004. This extension applies to the administrative review of three producers, Chandan Steel, Ltd., Isibars Steel, Ltd., and The Viraj Group. The period of review is December 1, 2002, through November 30, 2003.
来源原始语言: Federal Register — Department of Commerce打开原始公告 →