Comércio internacional · 26/11/20041 min de leitura
Stainless Steel Wire Rod From India: Extension of Time Limit for the Preliminary Results of the Antidumping Duty Administrative Review
Tradução automática local · Idioma original da fonte
Resumo
The Department of Commerce is extending the time limit for the preliminary results of the administrative review of the antidumping duty order on stainless steel wire rod from India until December 30, 2004. This extension applies to the administrative review of three producers, Chandan Steel, Ltd., Isibars Steel, Ltd., and The Viraj Group. The period of review is December 1, 2002, through November 30, 2003.