BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 2000/10/51 分钟阅读

Certain Stainless Steel Flanges From India; Extension of Time Limit for Preliminary Results of New Shipper Review

本地自动翻译 · 来源原始语言

摘要

The Department of Commerce (the Department) is extending the time limit for the preliminary results of a new shipper review of certain stainless steel flanges from India. This review covers one Indian exporter, Snowdrop Trading PVT LTD (Snowdrop), and the period February 1, 1999 through February 29, 2000.

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →