Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.
Réglementation et droit · 05/10/20001 min de lecture
Certain Stainless Steel Flanges From India; Extension of Time Limit for Preliminary Results of New Shipper Review
Traduction automatique locale · Langue originale de la source
Résumé
The Department of Commerce (the Department) is extending the time limit for the preliminary results of a new shipper review of certain stainless steel flanges from India. This review covers one Indian exporter, Snowdrop Trading PVT LTD (Snowdrop), and the period February 1, 1999 through February 29, 2000.
Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →