本文翻译正在准备中。在此之前,我们暂时显示英文原文。
监管与法律 · 2000/10/101 分钟阅读
Steel Concrete Reinforcing Bars From Turkey; Notice of Extension of Time Limits for Antidumping Duty Administrative Review
本地自动翻译 · 来源原始语言
摘要
The Department of Commerce is extending the time limits of the preliminary results of the antidumping duty administrative review on steel concrete reinforcing bars from Turkey. The review covers four producers/exporters of the subject merchandise to the United States. The period of review is April 1, 1999, through March 31, 2000.
来源原始语言: Federal Register — All Documents打开原始公告 →