Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.
Réglementation et droit · 10/10/20001 min de lecture
Steel Concrete Reinforcing Bars From Turkey; Notice of Extension of Time Limits for Antidumping Duty Administrative Review
Traduction automatique locale · Langue originale de la source
Résumé
The Department of Commerce is extending the time limits of the preliminary results of the antidumping duty administrative review on steel concrete reinforcing bars from Turkey. The review covers four producers/exporters of the subject merchandise to the United States. The period of review is April 1, 1999, through March 31, 2000.
Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →