本文翻译正在准备中。在此之前,我们暂时显示英文原文。
监管与法律 · 1999/10/211 分钟阅读
Notice of Extension of Time Limit for Antidumping Duty Administrative Review of Welded ASTM A-312 Stainless Steel Pipe From Taiwan
本地自动翻译 · 来源原始语言
摘要
The Department of Commerce (the Department) is extending the time limit for the preliminary results of the antidumping duty administrative review of the antidumping order on Welded ASTM A-312 Stainless Steel Pipe from Taiwan, covering the period December 1, 1997 through November 30, 1998.
来源原始语言: Federal Register — All Documents打开原始公告 →