Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.
Réglementation et droit · 21/10/19991 min de lecture
Notice of Extension of Time Limit for Antidumping Duty Administrative Review of Welded ASTM A-312 Stainless Steel Pipe From Taiwan
Traduction automatique locale · Langue originale de la source
Résumé
The Department of Commerce (the Department) is extending the time limit for the preliminary results of the antidumping duty administrative review of the antidumping order on Welded ASTM A-312 Stainless Steel Pipe from Taiwan, covering the period December 1, 1997 through November 30, 1998.
Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →