BN Business News
Şirketinizi ekleyin →
Bu çeviri hazırlanıyor. Bu süre içinde İngilizce orijinal sürümü gösteriyoruz.

Enerji ve çevre · 23.11.20041 dk okuma

Plan of Operations, Environmental Assessment, Padre Island National Seashore, TX

Yerel otomatik çeviri · Kaynağın orijinal dili

Özet

The National Park Service (NPS), in accordance with Sec. 9.52(b) of Title 36 of the Code of Federal Regulations and Executive Order 11988, Floodplain Management has received from BNP Petroleum Corporation a Plan of Operations for drilling and production of the Dunn-Peach No. 2, 3, 4 , 5, and 6 Wells from the existing Dunn-Peach No. 1 Well surface location 6.9 miles south along the Gulf beach, from the end of Park Road 22, within Padre Island National Seashore. Additionally, the NPS has prepared an Environmental Assessment and a Floodplains Statement of Findings for the site of the proposed wells.

Kaynağın orijinal dili: Federal Register — Interior DepartmentOrijinal duyuruyu açın →