BN Business News
Bedrijf toevoegen →
Deze vertaling wordt voorbereid. Voorlopig tonen we de oorspronkelijke Engelse versie.

Energie en milieu · 23-11-20041 min lezen

Plan of Operations, Environmental Assessment, Padre Island National Seashore, TX

Lokale automatische vertaling · Oorspronkelijke brontaal

Samenvatting

The National Park Service (NPS), in accordance with Sec. 9.52(b) of Title 36 of the Code of Federal Regulations and Executive Order 11988, Floodplain Management has received from BNP Petroleum Corporation a Plan of Operations for drilling and production of the Dunn-Peach No. 2, 3, 4 , 5, and 6 Wells from the existing Dunn-Peach No. 1 Well surface location 6.9 miles south along the Gulf beach, from the end of Park Road 22, within Padre Island National Seashore. Additionally, the NPS has prepared an Environmental Assessment and a Floodplains Statement of Findings for the site of the proposed wells.

Oorspronkelijke brontaal: Federal Register — Interior DepartmentOrigineel bericht openen →