BN Business News
Şirketinizi ekleyin →
Bu çeviri hazırlanıyor. Bu süre içinde İngilizce orijinal sürümü gösteriyoruz.

Düzenleme ve hukuk · 26.09.20021 dk okuma

Parker-Davis Project-Extension of the Rate Methodology for Firm Power Service and Firm and Nonfirm Transmission Service-Rate Order No. WAPA-98

Yerel otomatik çeviri · Kaynağın orijinal dili

Özet

This action is to extend the existing Parker-Davis Project (Parker-Davis) rate methodology for determining the firm power service rate and the firm and nonfirm point-to-point transmission service rates, established under Rate Order No. WAPA-75, through September 30, 2004. The existing Parker-Davis rate methodology will expire September 30, 2002.

Kaynağın orijinal dili: Federal Register — All DocumentsOrijinal duyuruyu açın →