Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.
Regulação e direito · 26/09/20021 min de leitura
Parker-Davis Project-Extension of the Rate Methodology for Firm Power Service and Firm and Nonfirm Transmission Service-Rate Order No. WAPA-98
Tradução automática local · Idioma original da fonte
Resumo
This action is to extend the existing Parker-Davis Project (Parker-Davis) rate methodology for determining the firm power service rate and the firm and nonfirm point-to-point transmission service rates, established under Rate Order No. WAPA-75, through September 30, 2004. The existing Parker-Davis rate methodology will expire September 30, 2002.
Idioma original da fonte: Federal Register — All DocumentsAbrir o comunicado original →