Энергетика и окружающая среда · 21.11.20191 мин чтения
Bellefonte Nuclear Plant; Consideration of Approval of Transfer of Construction Permits and Conforming Amendment
Локальный автоматический перевод · Язык оригинального источника
Краткое содержание
The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of an application filed by Nuclear Development, LLC (ND) on November 13, 2018. The application seeks NRC approval of the direct transfer of construction permits Nos. CPPR-122 and CPPR-123, for Bellefonte Nuclear Plant, Units 1 and 2, from the current holder, Tennessee Valley Authority (TVA), to ND. The application contains sensitive unclassified non-safeguards information (SUNSI).