BN Business News
Adicionar empresa →
Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.

Negócios · 08/09/20112 min de leitura

Notice of the Extension of the Comment Period for the Draft Environmental Impact Report/Environmental Impact Statement for the California High-Speed Rail Project Merced to Fresno Section

Tradução automática local · Idioma original da fonte

Resumo

FRA is issuing this notice to advise the public that the comment period for the Draft Environmental Impact Report (EIR)/ Environmental Impact Statement (EIS) that has been prepared for the California High-Speed Train (HST) Project Merced to Fresno Section (Project) has been extended and shall now end on October 13, 2011. This decision was made by the Authority and FRA in response to requests for extension of the comment period. FRA is the lead federal agency and the California High-Speed Rail Authority (Authority) is the lead state agency for the environmental review process. The Authority proposes to construct and operate a reliable high- speed electric-powered passenger train system along an approximately 65-mile corridor, from Merced, CA, to Fresno, CA that links those cities by delivering predictable and consistent travel times. The Project includes high-speed track alignments, stations in downtown Merced and Fresno. A heavy maintenance facility for assembly, testing, and commissioning of trains, train inspection and service, and train overhaul may be constructed in the Merced to Fresno Section. The Draft EIR/EIS presents the Project's purpose and need, identifies all reasonabl

Idioma original da fonte: Federal Register — Transportation DepartmentAbrir o comunicado original →

Explorar análises

Análises empresariais →