BN Business News
Aggiungi la tua azienda →
Questa traduzione è in preparazione. Nel frattempo mostriamo temporaneamente la versione originale in inglese.

Imprese · 08/09/20112 min di lettura

Notice of the Extension of the Comment Period for the Draft Environmental Impact Report/Environmental Impact Statement for the California High-Speed Rail Project Merced to Fresno Section

Traduzione automatica locale · Lingua originale della fonte

Riepilogo

FRA is issuing this notice to advise the public that the comment period for the Draft Environmental Impact Report (EIR)/ Environmental Impact Statement (EIS) that has been prepared for the California High-Speed Train (HST) Project Merced to Fresno Section (Project) has been extended and shall now end on October 13, 2011. This decision was made by the Authority and FRA in response to requests for extension of the comment period. FRA is the lead federal agency and the California High-Speed Rail Authority (Authority) is the lead state agency for the environmental review process. The Authority proposes to construct and operate a reliable high- speed electric-powered passenger train system along an approximately 65-mile corridor, from Merced, CA, to Fresno, CA that links those cities by delivering predictable and consistent travel times. The Project includes high-speed track alignments, stations in downtown Merced and Fresno. A heavy maintenance facility for assembly, testing, and commissioning of trains, train inspection and service, and train overhaul may be constructed in the Merced to Fresno Section. The Draft EIR/EIS presents the Project's purpose and need, identifies all reasonabl

Lingua originale della fonte: Federal Register — Transportation DepartmentApri il comunicato originale →

Esplora gli approfondimenti

Analisi aziendali →