Energia e ambiente · 23/09/20101 min de leitura

Boulder Canyon Project-Rate Order No. WAPA-150

Tradução automática local · Idioma original da fonte

Resumo

The Deputy Secretary of Energy confirmed and approved Rate Order No. WAPA-150 and Rate Schedule BCP-F8 extending on an interim basis the existing Boulder Canyon Project (BCP) rate-setting formula and approving the base charge and rates for FY 2011. The existing Electric Service Rate Schedule, BCP-F7, expires September 30, 2010. The Electric Service Rate Schedule contains a rate-setting formula that is recalculated annually based on updated financial and load data. The existing rate-setting formula is being extended under Rate Order No. WAPA-150 and Rate Schedule BCP-F8.

Idioma original da fonte: Federal Register — Energy DepartmentAbrir o comunicado original →