エネルギーと環境 · 2010/9/231 分で読めます
Boulder Canyon Project-Rate Order No. WAPA-150
ローカル自動翻訳 · 情報源の原言語
概要
The Deputy Secretary of Energy confirmed and approved Rate Order No. WAPA-150 and Rate Schedule BCP-F8 extending on an interim basis the existing Boulder Canyon Project (BCP) rate-setting formula and approving the base charge and rates for FY 2011. The existing Electric Service Rate Schedule, BCP-F7, expires September 30, 2010. The Electric Service Rate Schedule contains a rate-setting formula that is recalculated annually based on updated financial and load data. The existing rate-setting formula is being extended under Rate Order No. WAPA-150 and Rate Schedule BCP-F8.