Regulação e direito · 29/12/20151 min de leitura
Central Arizona Project-Rate Order No. WAPA-172
Tradução automática local · Idioma original da fonte
Resumo
The Deputy Secretary of Energy confirmed and approved Rate Order No. WAPA-172 and Rate Schedules CAP-FT3, CAP-NFT3, and CAP-NITS3, placing transmission service formula rates for the Central Arizona Project (CAP) of the Western Area Power Administration (Western) into effect on an interim basis. The provisional rates will be in effect until the Federal Energy Regulatory Commission (FERC) confirms, approves, and places them into effect on a final basis, or until they are replaced by other rates. The provisional rates will provide sufficient revenue to pay all annual costs, including interest expense, and repay required investment within the allowable periods.