BN Business News
أضف شركتك →
تجري حاليًا ترجمة هذا المقال. نعرض مؤقتًا النسخة الأصلية باللغة الإنجليزية.

التنظيم والقانون · 29‏/12‏/20151 دقائق للقراءة

Central Arizona Project-Rate Order No. WAPA-172

ترجمة آلية محلية · اللغة الأصلية للمصدر

الملخص

The Deputy Secretary of Energy confirmed and approved Rate Order No. WAPA-172 and Rate Schedules CAP-FT3, CAP-NFT3, and CAP-NITS3, placing transmission service formula rates for the Central Arizona Project (CAP) of the Western Area Power Administration (Western) into effect on an interim basis. The provisional rates will be in effect until the Federal Energy Regulatory Commission (FERC) confirms, approves, and places them into effect on a final basis, or until they are replaced by other rates. The provisional rates will provide sufficient revenue to pay all annual costs, including interest expense, and repay required investment within the allowable periods.

اللغة الأصلية للمصدر: Federal Register — All Documentsافتح البيان الأصلي →

استكشف الموضوعات

تحليلات الأعمال →