Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.
Regulação e direito · 28/12/20051 min de leitura
Dichlormid; Extension of Time-Limited Pesticide Tolerance
Tradução automática local · Idioma original da fonte
Resumo
This regulation amends 40 CFR 180.469 by extending the expiration/revocation date of the time-limited tolerances for residues of acetamide, 2,2-dichloro-N,N-di-2-propenyl- (dichlormid) in or on field corn (forage, grain, stover), pop corn (grain, stover), and sweet corn (forage, kernel plus cob with husks removed, stover) at 0.05 ppm. The current tolerances are set to expire on December 31, 2005. This rule extends the expiration/revocation date of these time-limited tolerances to December 31, 2008.
Idioma original da fonte: Federal Register — All DocumentsAbrir o comunicado original →