Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.
Regulación y derecho · 28/12/20051 min de lectura
Dichlormid; Extension of Time-Limited Pesticide Tolerance
Traducción automática local · Idioma original de la fuente
Resumen
This regulation amends 40 CFR 180.469 by extending the expiration/revocation date of the time-limited tolerances for residues of acetamide, 2,2-dichloro-N,N-di-2-propenyl- (dichlormid) in or on field corn (forage, grain, stover), pop corn (grain, stover), and sweet corn (forage, kernel plus cob with husks removed, stover) at 0.05 ppm. The current tolerances are set to expire on December 31, 2005. This rule extends the expiration/revocation date of these time-limited tolerances to December 31, 2008.
Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →