Comércio internacional · 28/10/20041 min de leitura
Stainless Steel Sheet and Strip in Coils From Italy; Extension of Time Limit for the Preliminary Results of Sunset Review of Countervailing Duty Order
Tradução automática local · Idioma original da fonte
Resumo
The Department of Commerce ("the Department") is extending the time limit for its preliminary results in the sunset review of the countervailing duty order on stainless steel sheet and strip in coils ("SSSS") from Italy. The Department intends to issue the final results of this sunset reviews on or about November 22, 2004.