BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Comercio internacional · 28/10/20041 min de lectura

Stainless Steel Sheet and Strip in Coils From Italy; Extension of Time Limit for the Preliminary Results of Sunset Review of Countervailing Duty Order

Traducción automática local · Idioma original de la fuente

Resumen

The Department of Commerce ("the Department") is extending the time limit for its preliminary results in the sunset review of the countervailing duty order on stainless steel sheet and strip in coils ("SSSS") from Italy. The Department intends to issue the final results of this sunset reviews on or about November 22, 2004.

Idioma original de la fuente: Federal Register — Department of CommerceAbrir el comunicado original →