Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.
Regulação e direito · 02/11/19991 min de leitura
Notice of Extension of Time Limit for Antidumping Duty Administrative Review; Certain Cold-Rolled Carbon Steel Flat Products From the Netherlands
Tradução automática local · Idioma original da fonte
Resumo
The Department of Commerce (the Department) is extending the time limit for the final results of the administrative review of the antidumping duty order on cold-rolled carbon steel flat products from the Netherlands. This review covers one manufacturer/exporter, Hoogovens Staal BV and Hoogovens Steel USA, Inc., and the period August 1, 1997 through July 31, 1998.
Idioma original da fonte: Federal Register — All DocumentsAbrir o comunicado original →