Deze vertaling wordt voorbereid. Voorlopig tonen we de oorspronkelijke Engelse versie.
Regelgeving en recht · 19-12-20071 min lezen
Certain Stainless Steel Butt-Weld Pipe Fittings from Taiwan: Notice of Extension of Time Limit for the Final Results of Antidumping Duty Administrative Review
Lokale automatische vertaling · Oorspronkelijke brontaal
Samenvatting
The Department of Commerce (the Department) is extending the time limit for the final results of the administrative review of the antidumping duty order on certain stainless steel butt-weld pipe fittings from Taiwan. The period of review is June 1, 2005, through May 31, 2006. This extension is made pursuant to section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act).
Oorspronkelijke brontaal: Federal Register — All DocumentsOrigineel bericht openen →