Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.
Réglementation et droit · 19/12/20071 min de lecture
Certain Stainless Steel Butt-Weld Pipe Fittings from Taiwan: Notice of Extension of Time Limit for the Final Results of Antidumping Duty Administrative Review
Traduction automatique locale · Langue originale de la source
Résumé
The Department of Commerce (the Department) is extending the time limit for the final results of the administrative review of the antidumping duty order on certain stainless steel butt-weld pipe fittings from Taiwan. The period of review is June 1, 2005, through May 31, 2006. This extension is made pursuant to section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act).
Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →