Basin Electric Power Cooperative: Notice of Intent To Hold Public Scoping Meetings and Prepare an Environmental Assessment

로컬 자동 번역 · 원본 출처 언어

요약

The Rural Utilities Service (RUS) intends to hold public scoping meetings and prepare an Environmental Assessment with Scoping (EA) to meet its responsibilities under the National Environmental Policy Act (NEPA) and 7 CFR part 1794 in connection with potential impacts related to a proposed project by Basin Electric Power Cooperative (Basin Electric). The proposed Big Bend to Witten Transmission Line Project (proposed action) consists of an approximately 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration (Western) substation called Lower Brule Substation, an addition to the existing Witten Substation, and approximately two miles of 230-kV double-circuit transmission line between Big Bend Dam and the new Lower Brule Substation. It is anticipated that some communication facility additions or enhancements may be necessary for the project including radio towers and buildings at Lower Brule Substation, Witten Substation, and one or two intermediate sites. Basin Electric is requesting RUS financial assistance for the proposed action.

원본 출처 언어: Federal Register — Agriculture Department원문 발표 열기 →