비즈니스 · 2026. 4. 24.1 분 읽기
Pipeline Safety: Hazardous Liquid Valve Maintenance Schedule
로컬 자동 번역 · 원본 출처 언어
요약
This NPRM proposes to allow operators of hazardous liquid and carbon dioxide pipelines to determine a valve inspection schedule with a maximum valve inspection interval of 1 year, not to exceed 15 months.