BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

에너지 및 환경 · 2023. 11. 13.1 분 읽기

Union Electric Company, dba Ameren Missouri; Callaway Plant, Unit No. 1

로컬 자동 번역 · 원본 출처 언어

요약

The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Renewed Facility Operating License No. NPF- 30, issued to Union Electric Company, doing business as (dba) Ameren Missouri, for operation of the Callaway Plant, Unit No. 1. The proposed amendment would revise the technical specifications (TSs), TS Bases, and Final Safety Analysis Report (FSAR), to allow use of one train of the normal, non-safety-related service water system to solely provide cooling water support for one of two redundant trains of TS-required equipment when both equipment trains are required to be Operable during cold shutdown/refueling conditions. Corresponding changes to the TS Bases will be made once the amendment to the TSs and FSAR is approved.

원본 출처 언어: Federal Register — Nuclear Regulatory Commission원문 발표 열기 →