Pre-Earthquake Planning, Shutdown, and Restart of a Nuclear Power Plant Following an Earthquake

로컬 자동 번역 · 원본 출처 언어

요약

The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 1 to Regulatory Guide (RG) 1.166, "Pre-Earthquake Planning, Shutdown, and Restart of a Nuclear Power Plant Following an Earthquake." This revision of RG 1.166 merges two related RGs, that is, RG 1.166 and RG 1.167, "Restart of a Nuclear Power Plant Shut Down by a Seismic Event." The guides were merged because they are similar in nature and contain overlapping guidance. RG 1.167 is being withdrawn concurrently because it is no longer needed.

원본 출처 언어: Federal Register — Nuclear Regulatory Commission원문 발표 열기 →