BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

에너지 및 환경 · 2016. 6. 21.1 분 읽기

Independent Spent Fuel Storage Installation, Department of Energy; Fort St. Vrain

로컬 자동 번역 · 원본 출처 언어

요약

The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to a request submitted by the Department of Energy (DOE or the licensee) on April 27, 2016, from NRC's requirement to comply with the terms, conditions, and specifications concerning testing and surveillance in Special Nuclear Material License No. SNM- 2504 for the Fort St. Vrain independent spent fuel storage installation (ISFSI). The exemption request seeks the extension of the time to perform an O-ring leakage rate test required by Technical Specification (TS) 3.3.1 of Appendix A of Special Nuclear Material License No. SNM- 2504 and to perform an aging management surveillance described in the Fort St. Vrain (FSV) Final Safety Analysis Report (FSAR). The DOE requests the dates for performance of the testing and surveillance requirements be extended until December 2016. The NRC previously granted DOE an exemption (80 FR 33299 dated, June 11, 2015) extending the completion date for these actions until June 2016.

원본 출처 언어: Federal Register — Nuclear Regulatory Commission원문 발표 열기 →