BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

규제 및 법률 · 2011. 9. 16.1 분 읽기

Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances

로컬 자동 번역 · 원본 출처 언어

요약

This regulation establishes an extension of time-limited interim tolerances for the combined residues of the insecticide tetrachlorvinphos [(Z)-2-chloro-1-(2,4,5-trichlorophenyl) vinyl dimethyl phosphate], including its metabolites, 1-(2,4,5- trichlorophenyl)-ethanol (free and conjugated forms), 2,4,5- trichloroacetophenone, and 1-(2,4,5-trichlorophenyl)-ethanediol, in or on multiple commodities which will be identified later in this document, under the Federal Food, Drug, and Cosmetic Act (FFDCA). The time-limited tolerances expire on March 18, 2013.

원본 출처 언어: Federal Register — All Documents원문 발표 열기 →