이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.
규제 및 법률 · 1998. 10. 9.1 분 읽기
Drawbridge Operation Regulations; New Jersey Intracoastal Waterway; Grassy Sound Channel
로컬 자동 번역 · 원본 출처 언어
요약
The Coast Guard is temporarily changing the regulations that govern the operation of the Route 47 (George A. Reading) bridge across Grassy Sound Channel, at Intracoastal Waterway (CW) mile 108.9 in Wildwood, New Jersey by requiring two-hours advance notice for bridge openings 24 hours a day beginning at 7 a.m. on October 19, 1998, through 5 p.m. on May 14, 1999. The bridge will be unattended during these time periods and requests for opening will require calling (609) 352-5362. This action is intended to allow the contractor to facilitate sandblasting and painting operations.
원본 출처 언어: Federal Register — All Documents원문 발표 열기 →