Georgia Power Co., et al.; Issuance of Amendment to Facility Operating License
로컬 자동 번역 · 원본 출처 언어
요약
Georgia Power Co., et al.; Issuance of Amendment to Facility Operating License
에너지 및 환경 · 1994. 3. 24.1 분 읽기
로컬 자동 번역 · 원본 출처 언어
요약
Georgia Power Co., et al.; Issuance of Amendment to Facility Operating License
관련 인사이트
비즈니스 인사이트 →관련 비즈니스 신호
6에너지 및 환경 · 2026. 8. 26.
The U.S. Nuclear Regulatory Commission (NRC, the Commission) is considering issuance of an amendment to Renewed Facility Operating License No. NPF-76, issued to STP Nuclear Operating Company (STPNOC); Constellation South Texas, LLC; City Public Service Board of San Antonio; and City of Austin, Texas, for operation of South Texas Project, Unit 1 (STP). The proposed license amendment would, if granted, make a one-time exigent change to the technical specifications (TS) to extend the allowed outage time (AOT) for TS 3.7.1.7, "Main Feedwater System". This proposed amendment is being requested to facilitate repairs to the Unit 1 train D main feedwater isolation valve (MFIV). This proposed amendment is being requested under exigent circumstances pursuant to NRC regulations.
요약 읽기 →에너지 및 환경 · 2026. 8. 21.
The U.S. Nuclear Regulatory Commission (NRC, the Commission) received and is considering approval of an application filed by Duke Energy Progress, LLC (DEP) and Duke Energy Carolinas, LLC (DEC) on March 20, 2026. The application seeks NRC approval of the direct transfer of Renewed Facility Operating License Nos. DPR-71 and DPR-62 for Brunswick Steam Electric Plant, Units 1 and 2, respectively; Renewed Facility Operating License No. NPF-63 for Shearon Harris Nuclear Power Plant, Unit 1; Subsequent Renewed Facility Operating License No. DPR-23 for H.B. Robinson Steam Electric Plant, Unit 2; and Renewed Materials License No. SNM-2502 for the H.B. Robinson Steam Electric Plant, Unit 2 Independent Spent Fuel Storage Installation, currently held by DEP, to DEC and issuance of conforming license amendments.
요약 읽기 →에너지 및 환경 · 2026. 8. 27.
The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of an application filed by NextEra Energy, Inc. (NextEra Energy), Dominion Energy, Inc. (Dominion Energy), Virginia Electric and Power Company (VEPCO), Dominion Energy Nuclear Connecticut (DENC), and Dominion Energy South Carolina, Inc. (DESC) (collectively the Applicants) on July 15, 2026. The application seeks NRC approval of the indirect transfer of the facility operating licenses, materials licenses, and general licenses for Surry Power Station, Unit Nos. 1 and 2 (Surry); North Anna Power Station, Unit Nos. 1 and 2 (North Anna); Virgil C. Summer Nuclear Station, Unit 1 (V.C. Summer); and Millstone Power Station, Units 1, 2, & 3 (Millstone); as well as the combined license for North Anna Unit 3; and the North Anna Early Site Permit. The application contains sensitive unclassified non-safeguards information (SUNSI).
요약 읽기 →에너지 및 환경 · 2026. 8. 24.
The U.S. Nuclear Regulatory Commission (NRC, the Commission) is issuing an order approving the application dated April 24, 2026, filed by Arizona Public Service Company (APS), on behalf of Public Service Company of New Mexico (PNM), Troy ParentCo LLC (Troy ParentCo), and their corporate affiliates (together, Applicants). The application sought NRC consent to the indirect transfer of control of PNM's co- ownership of the Renewed Facility Operating License Nos. NPF-41, NPF- 51, and NPF-74 for the Palo Verde Nuclear Generating Station (Palo Verde), Units 1, 2, and 3, respectively, as well as the associated general license for the Palo Verde Independent Spent Fuel Storage Installation (ISFSI) (together, the facility). No physical changes or operational changes to the facility were proposed in the application.
요약 읽기 →에너지 및 환경 · 2026. 8. 28.
The U.S. Nuclear Regulatory Commission (NRC) is considering approval of an export application, received on June 9, 2026, from EnergySolutions Services Inc. (ESSI). In the application, ESSI seeks to amend and renew an existing license, XW018, authorizing the export of radioactive material to Germany. The NRC is providing notice of the opportunity to comment, request a hearing, and petition to intervene on ESSI's application. This action will renew the existing export license for an additional 10 years (to expire on December 31, 2036) and amend the existing export license to update the licensee's address to 151 Lafayette Drive, Oak Ridge, Tennessee 37830.
요약 읽기 →에너지 및 환경 · 2026. 8. 26.
The U.S. Nuclear Regulatory Commission (NRC) is providing public notice each week, for four consecutive weeks, of receipt and availability of an application for renewal of early site permit (ESP) ESP-003 for the North Anna ESP site from Virginia Electric and Power Company, doing business as (dba) Dominion Energy Virginia. Renewal of the ESP would allow the licensee to reference ESP-003 in a construction permit (CP) or combined license (COL) application for an additional 20- year period beyond the period specified in the ESP. The location for the North Anna ESP site is in Louisa County, Virginia, and the current ESP-003 expires on November 27, 2027.